ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Pregnancy, which is characteristically associated with changes in hormone levels in the body is a process tightly regulated by:
1) The goal of scientific experimentation is to increase what we know about how the natural world operates. If a hypothesis istested repeatedly by a wide variet
On the first day of a marketing campaign, a team sent a total of 14 emails to potential clients. Their goal is to increase the number of emails sent per day by
A farmhouse shelters 10 animals. Some are pigs and some are ducks. Altogether there are 36 legs. How many of each animal are there?
20% tip on a bill of 39.27
31. Ship Rock in New Mexico is an example of a ___________. a. laccolith b. volcanic neck
23. Imagine a ball on a track where no energy is transferred between the ball and the track or between the ball and the air around it. The ball starts from rest
How did Franklind D. Roosevelt attempt to win American support?
What does the sequence of nucleotides in DNA code for?
How does the writ of habeas corpus affect the courts?